Our AdvantagesProducts Large volume in Stock, No MOQ required We comply with all the international standards, these kinds of as ISO9001 and TS16949 standards. The new merchandise incorporate a series of high-tech and higher quality chains and sprockets and gears, these kinds of as chains and gearboxes for agricultural machineries, metallurgical chains, escalator action-chains, high-velocity tooth chains, timing chains, self-lubrication chains, among which have variety higher pace tooth chain for car department dynamic box and aerial chains fill in the blanks of chain in China. Our merchandise variety consists of all sorts of helical equipment, spur equipment, bevel equipment, gear rack, worm equipment, sprockets,chains, bearings. EPT Made EPT Responsibility Horizontal CNC Lathe
For Turning Steel Roller commaEPT Cylinder commaTire Mould commaWheel Hub Turbine commaFlange commaOil Pan commaShaft commaetc
1 period OutstXiHu (West Lake) Dis.Hu (West Lake) Dis. Attributes colon
one rpar period of time Have Load as EPT as Possible colon Internationally forerunner computation systems and optimized finite component analysis approaches are adopted and the picked materials are suitable for the layout period
2 interval rpar time period Higher Rigidity comma Security and EPT Servicing colon All castings are created of higher-energy meehanite EPT250 time period which is especially suitable for large cutting interval All huge castings stand the test of annealing and vibration aging and internal anxiety is eradicated comma so the overall precision is tremendously enhanced and processed elements are discovered with high geometric precision period of time
three period rpar 1-piece composition made of meehanite comma drastically enhXiHu (West Lake) Dis.Hu (West Lake) Dis.ng its abrasion resistance comma and the interior force elimination process makes substantial vibration resistance and substantially enhances balance period of time The cross-formed base and rectangular bearing framework guarantee substantial structural steadiness and forever secure quality period
4 period rpar The lathe mattress is in set weighty chopping construction comma incXiHu (West Lake) Dis.Hu (West Lake) Dis. rectangular challenging rails tested by EPT warmth remedy and high-precision surface grinding lparstraightness in total stroke lt0 period05mm rpar period
five time period rparTurcite-B is pasted on the sliding surface in orEPTto increase the rail aposs smoothness and sporting resistance period of time The widened challenging rail layout can give necessary resistance and stability for heavy chopping period of time
6 interval rpar The headstock comma made of high toughness and large rigidity keel rib comma is in EPT cage condition comma and the EPT incEPTs course P5 grinding EPTs comma which can supply attractive driving precision and greater torque period of time
seven period rpar Incorporating German AM systems comma the main shaft is manufactured of chrome-molybdenum alloy and proves large precision comma high rigid and fascinating deformation resistance after tough solfinish machining comma carbonization comma growing older treatment method and precision grinding time period The motor figures substantial output lpar26kw rpar and the max time period rev interval is 3000RPM interval Following the principal shaft assembling is completed comma the complete assembly shall be calibrated by dynamic balance test time period The impartial lubrication will further enhance the security of the headstock during procedure period of time
8 interval rpar StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd four knife library comma mounted on a turret utilised in precision turning period
9 period rpar The tailstock is made up of two parts colon the higher a single incEPTs a sleeve moving system comma spindle assembly comma and a shaft cEPTrline adjustment system comma with a rectangular head in the rear comma which is designed to lock the sleeve manually semi and the reduce one particular incEPTs a tailstock quick-transferring motor and a locking system comma with the principal shaft put in on the substantial-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the higher-precision rotating best on the tailstock time period However comma in orEPTto satisfy specific EPT requirements of the machining procedure comma it is possible to transfer the plug board from the flange groove in the front of the sleeve to the groove in close proximity to the front conclude of the principal shaft in orEPTto repair the major shaft and receive a EPT cEPTr period of time
ten rpar The Primary EPT elements are strictly inspected by the authority composition or the authoritative 3rd celebration to make certain the outstanding quality and high precision time period
The pursuing picture is the principal part that are inspected period of time
More than 50 years apos encounter in EPTry sector considering that 1960s period
MaXiHu (West Lake) Dis.mize Consumer aposs Profitability unEPTthe bare minimum invest EPT when compared with other opponents interval
Application colon This sequence hefty obligation horizontal lathe can uEPTze substantial-velocity metal and carbide cutting instruments to complete rough or complete turning procedure for not only the non-ferrous metals like different composition steels comma casting steels and irons comma but also the exterior solinternal cylindrical sol conical sol spherical surfaces comma thread of non-steel materials and all types of the area of curve rotary human body period What aposs far more comma it can also comprehend the constant velocity slicing line interval
2 period EPT Parameters
Title | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Unit | ||||||
Max time period Swing Above Bed | mm | 1000 | 1250 | 1600 | 2000 | 2500 | 3000 |
Max interval Swing More than the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max period of time WeigEPT of Function-piece | T | ten | 15 | twenty | twenty | 20 | forty |
Max interval Duration of Work-piece | mm | 3000-12000 | |||||
Gears of Spindle Pace | sol | Infinitely Variable Velocity solstep-less velocity | |||||
Selection of Spindle Pace | r solMin | ten-three hundred | 10-two hundred | 10-a hundred and sixty | 4-80 | four-80 | 1 period6-sixty three |
Chuck Diameter | mm | 800 | one thousand | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West Lake) Dis.s Feed Range | mm solMin | -3000 | |||||
Horizontal Stroke | mm | five hundred | 625 | 800 | one thousand | 1250 | 1000 |
EPTitudinal Stroke | mm | 3000-12000 | |||||
Principal Driving EPT | Kw | 11 | 22 | 45 | seventy five | seventy five | seventy five |
Chopping Power lparCarriage rpar | Kn | 4 | 6 | 20 | 40 | forty | sixty |
Sleeve Diameter of EPTilstock | mm | 180 | a hundred and eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | a hundred twenty five | one hundred twenty five | 160 | 160 | a hundred and sixty | 240 |
three interval After-sale Provider amp Routine maintenance
one period We provide expert specialized training for customers apos operators and upkeep staff to allow them to correctly use and function the lathe and have out normal servicing interval
2 time period Guarantee period of time colon 1 calendar year right after acceptance of the lathe time period
three time period In situation of any quality difficulty discovered throughout procedure comma the factory will dispatch personnel to the user aposs area inside forty eight several hours lpardomestic consumers rpar amp within 3 daEPT lparForeign Buyer rpar and the technological workers won apost leave just before resolving the malfuntion period
four period The company will freely give distinct EPT and mechanical areas for the obtained lathe timely in warranty period of time period
5 period The business will offer life time assure for the consulting services in phrases of software comma servicing comma repair comma renovation comma etc of equipments interval
For a lot more information comma you should feel cost-free to make contact with us period of time Thanks excl